Option Wastewater EN 1610 - 222607
Testing of wastewater pipelines
Option Wastewater EN 1610
- Wastewater Procedure Air
Carry out the tests with the test medium air in accordance with the regulations mentioned. EDS2-P 1 bar pressure sensor is required. - Wastewater Procedure Water
Carry out the tests with the test medium water in accordance with the regulations mentioned. EDS2 level probe and EDS2 dosing pump are required.
The menu item "Wastewater Procedure Water" will only be completed in Q2/2023 and can be installed via an update of the unit without additional booking as soon as it is available.
EN 1610 Procedure A (air)
EN 1610 Procedure W (water)
The inspection in the Wastewater Procedure Water is usually applied to manholes or pipes connected to a manhole, so that the inspection can be carried out using the level measurement method. With the help of the EDS2 level probe, the water level in the manhole filled with water can be measured and checked. If there is a leak in the manhole (or the adjacent pipe), the resulting drop in the level will be reliably detected by the smart memo.
Detailed information on the wastewater procedure and the necessary measuring technology can be found here.